    UCO Lick Observatory Drawings Database 
      We have developed a comprehensive searchable database of engineering drawings, dating back to the early 20th century, accompanied by high-resolution, large-size TIF images. The project is a work in progress, and there are currently over 8500 records available to search. 
      Lick Observatory Telescope Operations and Maintenance Manuals 
      Care and feeding of the major telescopes and instruments on Mt. Hamilton. 
         | 
  
  
      | 
    The Shane AO/IRCAL System,  an upgrade of the Lick 3-Meter Laser Guidestar Adaptive Optics system, is a  diffraction-limited imager and spectrograph designed for astronomical  observations in the J, H, and K near-infrared bands using the Shane 3-meter  telescope. The system uses adaptive optics for correction of atmospheric image  blur and a high-sensitivity infrared science detector sampled for  diffraction-limited observations. The illustration shows the system from above, showing lightpaths in light yellow (click to enlarge). 
       
      Shane AO will result in high AO performance in the visible 
      spectrum and super high AO performance in IR. There will be a 
      significant increase in sensitivity for dimmer stars, and longer 
      exposure times rivaling the Keck 10 meter telescope. The improved science 
      reach for the new AO system comes from the increased throughput, 
      higher Strehl (AO performance), and better camera focal plane 
      sampling. All of the current programs will benefit greatly from this improvement, and 
      new programs will be possible. Principal Investigator: Don Gavel  | 
  
  
      | 
    The  Keck I Deployable Tertiary Mirror is a deployable tertiary mirror for  the Keck I (K1) telescope. It will provide a 5' field-of-view (FOV) to any Nasmyth port,  satisfying the observational needs of all current and planned instrumentation  on K1 at this focus. Ideally, this mirror will shift between states (stowed,  deployed) in less than 15 minutes and provide observations with any K1  instrument on any given night.  
       
      K1DM3 will be a major enhancement of flexible  observing at Keck, enabling rapid targets of opportunity observations, cadence  programs, and ‘bad weather scheduling’ using the suite of K1 instrumentation. The K1DM3 will have the ability to switch between Nasmyth platforms  and lock to any desired instrument on either platform.  When stowed, it will track with the  Cassegrain instrument below (LRIS or MOSFIRE) in order to remain out of the  instrument’s FOV.  In all other respects  the design will be entirely interchangeable and identical in form, fit, and  function to the existing M3 equipment module. Principal Investigator: J. Xavier Prochaska      | 
  
  
      | 
    Keck Cosmic Web Imager (KCWI) is an integral-field spectrograph optimized for precision, 
      sky-limited spectroscopy of low-surface-brightness phenomena. 
      KCWI will feature high throughput, and flexibility in field of 
      view, spatial sampling, bandpass, and spectral resolution. KCWI 
      will cover the optical spectral regime using optimized blue and 
      red channels in a manner similar to LRIS.  
      The two dimensional spectroscopic capability and sensitivity of  
        KCWI will allow it to investigate science questions as far-ranging as  
        nebulae around dying stars, the coupled evolution of galaxies and  
        quasars, and glowing gas surounding the first stars.  
       The  camera barrel assembly (with its many cells) will be designed, fabricated, and  assembled at Lick and delivered to Caltech Optical Observatories for integration and installation with  the instrument. UCO Principal Investigator: Constance Rockosi  | 
  
  
      | 
    APF - Automated Planet Finder (this site is restricted)  
        The discovery of Jupiter-like planets orbiting nearby stars began at Lick Observatory in 1995. These discoveries 
        have spawned a race for the detection of lower mass planets more like our Earth. We propose to dramatically 
        improve the world-renowned planet search at Lick Observatory by constructing the first dedicated Automated 
        Planet Finder. This facility will consist of a 2.5-meter class automated telescope and enclosure, and a high-resolution spectrograph. It will permit detection of low-mass, Earth-like planets by targeting nearby stars and observing them 
        every night for months. To date, the dome, telescope, and spectrograph have been completed. Final testing is underway. To see the dome, click here.
        Principal Investigator: Steve Vogt  | 
  
  
      | 
     Lick Observatory 12-inch Telescope Refurbishing Project 
      The Lick Instrument and Optics Shops are engaged in efforts to refurbish the historic 12" refracting telescope. Installed in the dome 
      which now houses the 40" Nickel telescope, the telescope utilized best-of-class optics made by famed lensmaker Alvan Clark. 
      He considered the objective lens he made for the telescope to be one of the best he ever made. He and his sons went on the make 
      the lenses for the 36" refractor, the largest in the world at that time. 
      First used by Lick astronomers to observe Mercury's transit of the Sun on November 7, 1881, the 12" was the main telescope on 
        Mt. Hamilton as the great 36" refractor and its dome were being built. It has gone unused for many years, and it will now be restored 
        as an important part of Lick Observatory's history.
           | 
  
  
     LRIS Upgrade  
The goal of this project was to replace the existing CCD in the red side of LRIS with a 2 x 1 mosaic of 2k x 4k fully-depleted LBNL CCDs to increase the sensitivity of the red channel of the instrument and eliminate fringing. Other improvements include a modest increase in spatial and spectral coverage, improved image uniformity due to a flatter detector, and increased reliability for the detector readout electronics.
First light achieved on June 7, 2009: M51 - Whirlpool Galaxy. 
      Principal Investigatos: Constance Rockosi, Mike Bolte   | 
  
  
    Cassegrain ADC  
      The Low-Resolution Imaging Spectrograph on Keck-1 provides imaging and spectroscopy from the ultraviolet (3100A) to near-infrared (1 micron). Unfortunately, atmospheric refraction, acting much like a prism, results in a displacement of an incoming beam that depends on wavelength and zenith distance. This atmospheric dispersion, even at modest zenith angles above 60 degrees, can seriously reduce slit throughput if the position angle of the slit is not perpendicular to the horizon. To correct for this problem, an Atmospheric Dispersion Corrector (ADC) has been built. First light was achieved on January 27, 2007, and commissioning completed in March 2007. 
      Principal Investigator: Joe Miller  | 
  
  
    HIRES - High Resolution Spectrograph Dewar Upgrade on Keck I: The new system replaced a single CCD using 24 mm pixels with a mosaic of three CCDs, using 15 mm pixels each. Consequently, this upgrade provides not only a 130% increase in area of the CCD detectors, but also significantly increases the resolution of the pictures obtained. First light for the new detectors was August 2004.  
      Principal Investigator - Steve Vogt   | 
  
  
    TV Guide Camera - UCO/Lick Observatory has produced new field acquisition and telescoping guiding cameras to replace the existing guiders on Mt. Hamilton.   | 
  
  
    DEIMOS - DEep Imaging Multi-Object Spectrograph 
      This instrument is a two-beam spectrograph that has been installed on the right Nasmyth platform of Keck-II. Presently only one beam is operable. First light was June 2002.  
      Principal Investigator - Sandra Faber   | 
  
  
    ESI - Echellette Spectrograph and Imager 
      This spectrograph is a Cassegrain instrument that is being used on Keck-II. First light was achieved in August 1999.  
      Principal Investigator - Joe Miller  
      Co-Principal Investigators - Michael Bolte, Raja Guhathakurta, Harland Epps, Dennis Zaritsky   | 
  
  
    HIRES - High Resolution Spectrograph 
  The high resolution spectrograph is currently the workhorse instrument on Keck-I. First light was successfully achieved in June of 1993. 
    Principal Investigator - Steve Vogt      
     
     |