to the SSC-Sept 10/01
DEIMOS Camera
Planned tests before removal from
Instrument
•Repeat the double-pass test with the Cohu detector and fiber once dewar is removed from DEIMOS; this will be the key diagnostic test used in the optical lab during the repair process. Measures both the image motion and image quality.