 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
• |
Larger
image motion when slides clamped at PA 0; need
|
|
to fix
this
|
|
|
• |
Finish
trolley and test
|
|
|
• |
Adequate
test time for all stages; time to analyze and
|
|
|
digest
test data
|
|
|
• |
DS 9
|
|
|
• |
Observers
GUI
|
|
|
• |
Camera
flexure (after PSR)
|
|
|
• |
Commission
Slider 5 (after PSR)
|
|
|
• |
Red
Science array (after PSR)
|
|