•Extend the N platform
•Reinforce N platform
•Reinforce N Deck
•Design ,
fabricate and install the cable boom
•Install the N
tracks on the DEIMOS side, and increase rack on deck
•Increase the
elevation axis telescope cable wrap (done)
•Run air,
glycol, co-ax fiber and power lines to the cable boom
•Mount and
install DEIMOS computers and disk drives
•Interface control document
•Differential Guiding
•Configuring of accounts
•