Shane AO |
|
|
Procedure: LGS Files Preparation2017-11-17Subject: **LCH MTOS Request -- November 2017** -- Please Reply Sender: JFCC SPACE/Laser Clearinghouse Copy: JFCC SPACE/Laser Clearinghouse Date: 17.11.2017 16:33 LCH MTOS Input Form v2.xlsx smime.p7s Good Afternoon, This is another wide-distro email update. Based on the last big email in September, I've removed several folks no longer associated with a laser program. If you are still receiving this and are not involved with an LCH-registered laser and wish to be removed from our contact roster, please let me know. Please read the following items and reply as necessary: 1) Thank you for your schedule replies in September. We received far fewer responses in October, and only a couple this month (so far). Please remember that we are requesting MTOS responses by the 15th day each month. These responses are required for all non-waived lasers, as well as waived lasers that target satellites. As I mentioned previously, repeated failure to provide this scheduling information may result in an authorization freeze. 2) The attached MTOS Input Form has gone through a minor revision - rather than have two columns to denote days of operation and days of operation with satellite targets, I have simplified that to one column that accepts a code based on the type of activity for a given day. Please see the new instructions within the file and let me know if you have any questions about it. Sorry for changing the format again! 3) Please submit schedule inputs for NOV 2017 through NOV 2018 (see the tabs at the bottom of the worksheet) as soon as possible. We generally expect that you be able to provide accurate/reliable schedule information for at least the next 30 days, and ask that dates for the next 12 months also be marked when possible. Use the appropriate code to denote whether a day of activity is confirmed (C), or tentative (T). If targeting a satellite on a given day, append a "S" to the C or T. "N" can be used for days or long stretches of time when you know the laser will not be fired. 4) If you are currently in the process of registering a laser for the first time and do not yet possess an authorization to receive deconfliction, you are not required to submit MTOS responses until you receive your authorization. 5) NOTE TO NON-WAIVED LASERS: We no longer require "re-registration" each year. So long as the technical parameters of the laser, its software, or your procedures remain unchanged, you do not need to submit a revised registration form. If you will be making a change to the laser, software, or procedures, please contact us so we can determine what (if any) documentation requires revision. 6) NOTE TO WAIVED LASERS: For a period of about 30 days, emails sent to us from external accounts (i.e. not .mil or .gov) were not arriving. If you submitted a request for renewal of your waiver, and did not receive a reply, please re-send that request. 7) As a reminder to all, jspoclch@us.af.mil is no longer in use. laserclearinghouse@us.af.mil is the replacement address. Please let me know if you have any questions! Thank you and have a great weekend. V/R, Austin C. Baker CPT, FA40 Laser Clearinghouse JFCC SPACE 805-606-1282 2017-09-08 Good Afternoon, This is a wide-distro update email. I am re-building our distribution list to ensure I am contacting the right people for all of our registered programs (waived and non-waived). Please read the following items and reply as appropriate. 1) If you are the primary point of contact for the LCH and have oversight of scheduling of NON-WAIVED laser activities, please submit a Master Test and Operations Schedule (MTOS) Input Form no later than 15 September so we can capture your projected dates of activity. If dates are hard to determine, or are not firm, please mark approximate days and indicate in the notes field that they are tentative. Our expectation is that input for the next 30 days will be reasonably accurate and reliable -- any other dates for the following 11 months should be provided if available. (NOTE: If you have recently submitted an MTOS response in the last couple of weeks, there is no need to re-submit). ***NOTE: Failure to provide scheduling information will result in a freeze of your authorization (PRM processing will cease) until schedule information is provided IAW the Information Exchange Requirements outlined in the signed deconfliction plan/Appendix A and LCH Reports Handbook.*** 2) If you are currently in the process of registering a laser for the first time and do not yet possess an authorization to receive deconfliction, please disregard the MTOS request above. 3) If you are receiving this email but are no longer involved with the laser system/program we had been communicating about (or the laser is now retired and will not be used again), please let me know. If I should be contacting somebody else instead, please provide that person's name and email address. 4) If you had received a waiver letter from us and it is now more than 12 months old, and you wish to request a renewal of the waiver, please let me know. 5 The most recent reports handbook (2017-06-16) is attached for your use and records. 6) Please note that jspoclch@us.af.mil is no longer in-use. Instead, please use laserclearinghouse@us.af.mil in addition to emailing me directly at austin.baker.5@us.af.mil. 7) If you have submitted something to us and not yet heard back, please let me know so I can engage. Standing by for any questions you may have. Thank you! V/R, Austin C. Baker CPT, FA40 Laser Clearinghouse JFCC SPACE 805-606-1282 2017-06-21 ALCON, Good day! There is quite a bit of change this month and we wanted to reach out to you all with an update. 1 - As of 22 June, LCDR Miller and MSgt Tarrant will both be departing the Laser Clearinghouse and Vandenberg Air Force Base. This unfortunately means that CPT Austin Baker and Mrs. Heather Witts will be the only remaining LCH personnel for the time being. Please direct all communication to LaserClearinghouse@us.af.mil and we ask for some patience in response times. 2 - LCH is out of the office 1-4 July. If you plan to operate over the 4th of July holiday weekend, please contact LCH ASAP to arrange scheduling and minimize LCH personnel coming in during down days. 3 - Please continue to send all communications to LaserClearinghouse@us.af.mil. The previous org box is no longer used or checked. 4 - The Master Test & Operations Schedule (MTOS) is attached. This has replaced the Laser Test Master Schedule (LTMS) and provides known operations ahead of time for planning purposes. Please complete the attached (as required) and reference the verbiage below taken from the LCH Reports Handbook. 3.3 Master Test and Operations Schedule (MTOS) Input Form (IER #1) Summary: The MTOS Input Form is a spreadsheet provided by the LO/O to the LCH that provides a forecast of laser activities for at least the next month, but up to the next 12 months. LO/Os will use the LCH MTOS Input Form to indicate days on which "live fire" operations will occur, and additionally identify any "live fire" events that will target Resident Space Objects (RSOs). Make use of the notes column to provide any additional details. Time Frame: Monthly (prior to the 15th) Note: This spreadsheet may only be populated with unclassified schedule information. Contact LCH for the classified reporting format. Finally, we ask for your patience during this critical manning timeframe. The SSA Ops Cell (SADTs) are being leaned on heavily to assist with day to day operations. We ask that programs complete all required actions on their end as the SADT workload is higher than normal during this time. Thank you, and happy shooting! V/r, JFCC SPACE/J39 Laser Clearinghouse 276-1282 (DSN) 805-606-1282 (COMM) LaserClearinghouse@us.af.mil 2017-03-31 Space-Track just added support for uploading multiple files via a single API command. Please visit our Beta site "How To" section using the link below to see examples of uploading/downloading files through our API. If you upload multiple files to space-track at once, please try out the new feature and let us know your feedback at admin@space-track.org. "how to" URL: https://beta.space-track.org/documentation/#howto-api_curl_files 2015-12-07 (Notification 2015-11-24): On 7 December 2015, Space-Track will change how long files are retained on the FILES Panel. Each folder will have a setting that determines how many days its files are retained before they are deleted. To see files you have access to and their scheduled deletion dates please go to the following URL: Space-Track: File Deletions Any file with a deletion date prior to 7 December 2015 will actually be deleted on 7 December 2015. 2015-11-23: Space-Track added support for uploading multiple files via a single API command. Visit the Beta site's How To section using the following URL to see examples of uploading/downloading files through the API. Space-Track: How To Upload Multiple Files 2015-02-17: The Laser Shutdown Monitor has been updated to enhance laser safety. PAM files are processed in the same way (using lsmParse, lsmCheck, and lsmNames) and the new monitor software is: user@shimmy:/usr/local/lick/bin/LSM.tcl (shimmy replaced a defunct shred 2017 Q1.) The new monitor checks the position listed in the .lsm file (and type, AZEL or RADEC) with the telescope state (position and tracking) in addition to the satellite shutdowns. If there are problems, use the old software: user@shimmy:/usr/local/lick/bin/lsm.tcl (shimmy replaced a defunct shred 2017 Q1.) and edit the target .lsm file to remove the first two lines (starting with Type: and Target:, respectively). I have also changed the required format for LGS target lists submitted by observers. The format is described at the following URL: http://mtham.ucolick.org/techdocs/instruments/ShaneAO/prep/ Observers can use either the slightly revised Lick format or Keck format target lists. Instructions for how to deal with target lists using targetListParse.tcl are available at the following URL: http://mtham.ucolick.org/techdocs/techref/ShaneAO/LGStargetLists.html |
This document last updated (UTC): Tuesday 04 March 2025 |